Skip to content
Department 02

Construction

Site teams that execute the designed structure, from earthworks to handover.

Department 02

Construction

Concrete, steel, hydraulics and earthworks: our teams build from the very drawings the design office produced.

01

What was calculated is what gets poured

Execution starts from the calculation notes, not from an interpretation of the drawing. Differences are settled beforehand, not observed afterwards.

02

The check happens the day before

Formwork, clean joints, cover spacers, equipment on hand: the check the day before avoids the redo the day after.

03

One technical direction

Design and construction answer to the same person. Nobody passes the blame next door.

Site teams that execute the designed structure, from earthworks to handover.

See also

Design & Engineering

A multidisciplinary team that designs, sizes and verifies the structure before the first spade hits the ground.

Discover