Department 02 · Construction
Concrete construction
Reinforced concrete structures, from raft to parapet, poured to the design office's execution drawings.
Reinforced concrete is judged at three moments: sizing, reinforcement and the pour. The last two are visible, the first is not — and it is the one that decides the rest.
Frames, walls and retaining structures, with formwork and cover checked the day before the pour rather than noted afterwards.
Deliverables
- Site setup and preparation
- Formwork, reinforcement and pouring
- Checks on cover and construction joints
- Handover and clearing of outstanding items

Three missions
Concrete construction
01
Foundations, rafts, shear walls, columns, beams and slabs.
02
Reinforcement and strength checks before every pour.
03
Structural finishes, masonry and repairs to existing structures.
Services