Design and supervision of 4.2 km of sanitation collectors and the associated roadworks for an urban extension.

Birtouta · 2021

The network's vertical alignment was optimised to remain fully gravity-fed along its entire length, eliminating a pumping station planned in the preliminary design.

Manholes were positioned according to operational constraints, with access from the final road layout.

The long-term operating savings were presented in a techno-economic report attached to the file.

Key figures

Length
4,2 km
Manholes
96
Pumping station
Eliminated
Duration
14 months