Semi-buried reservoir

A 1,500 m³ reinforced concrete reservoir designed to secure the drinking water supply of a group of municipalities.

Capacity
1 500 m³
Duration
11 months
Concrete poured
780 m³
Assignment
Design + works
Semi-buried concrete water reservoir under construction

Section 03.136°43'N 3°00'E — The project

What we did.

The structure sits on heterogeneous soil, which required revising the foundation design after the geotechnical survey. The raft foundation was split into two sections separated by a watertight joint to absorb differential settlement.

Interior waterproofing was applied with a water-repellent coating and verified through a progressive seven-day water test, with daily level readings and inspection of the wall surfaces.

Delivery took place in line with the contractual programme agreed with the client.

Client
Local authority
Assignment
Detailed design and construction
Location
Tipaza, Algeria
Year of delivery
2023
Area / capacity
1 500 m³
Concrete reservoir walls before backfilling
Dense rebar layout of the raft foundation before pouring