Industrial steel warehouse

A 2,400 m² steel-framed storage hall with a 24-metre clear span, erected in five months.

Area
2 400 m²
Clear span
24 m
Steel
165 t
Duration
5 months
Low-angle view of an industrial warehouse's steel frame

Section 03.136°43'N 3°00'E — The project

What we did.

The brief required a floor area entirely free of columns to allow forklift movement. We opted for 24-metre trussed girders spaced 6 metres apart, resting on fixed-base columns.

Assembly was prepared in the workshop and bolted on site, which shortened erection time and limited welding work at height.

The double-skin cladding envelope provides thermal insulation and high-level ventilation for the hall.

Client
Private agri-food group
Assignment
Design-build
Location
Rouiba, Algeria
Year of delivery
2022
Area / capacity
2 400 m²
Crane-assisted erection of the trussed girders
Assembly drawings of the steel framework
All projects

Section 0736°43'N 3°00'E — Contact

A project to study or to build?

Professionalism and expertise at the service of the construction trades.