Section 03 — 36°43'N 3°00'E — Steel
Industrial steel warehouse
A 2,400 m² steel-framed storage hall with a 24-metre clear span, erected in five months.
- Area
- 2 400 m²
- Clear span
- 24 m
- Steel
- 165 t
- Duration
- 5 months

Section 03.1 — 36°43'N 3°00'E — The project
What we did.
The brief required a floor area entirely free of columns to allow forklift movement. We opted for 24-metre trussed girders spaced 6 metres apart, resting on fixed-base columns.
Assembly was prepared in the workshop and bolted on site, which shortened erection time and limited welding work at height.
The double-skin cladding envelope provides thermal insulation and high-level ventilation for the hall.
- Client
- Private agri-food group
- Assignment
- Design-build
- Location
- Rouiba, Algeria
- Year of delivery
- 2022
- Area / capacity
- 2 400 m²


Section 03.2 — 36°43'N 3°00'E — See also
Other structures.
Section 07 — 36°43'N 3°00'E — Contact
A project to study or to build?
Professionalism and expertise at the service of the construction trades.