Fire safety compliance upgrade of a hotel

Diagnosis and overhaul of the fire safety systems of an operating public-facing establishment.

Algiers Centre · 2023

The establishment remained open during the study: phasing was designed so that every floor kept two compliant emergency exits at all times.

The file includes fire-resistant partition plans, escape route layouts, positioning of firefighting equipment and the smoke extraction calculation report.

Support continued through to the safety commission's inspection visit.

Key figures

Area covered
6 200 m²
Levels
8
Study duration
4 months
Deliverable
Commission submission file