Fire safety compliance upgrade of a hotel
Diagnosis and overhaul of the fire safety systems of an operating public-facing establishment.
Algiers Centre · 2023
The establishment remained open during the study: phasing was designed so that every floor kept two compliant emergency exits at all times.
The file includes fire-resistant partition plans, escape route layouts, positioning of firefighting equipment and the smoke extraction calculation report.
Support continued through to the safety commission's inspection visit.
Key figures
- Area covered
- 6 200 m²
- Levels
- 8
- Study duration
- 4 months
- Deliverable
- Commission submission file