Techno-economic studies
Costing, feasibility and trade-off analysis.
- Department
- Design
- Service
- 06
- Base
- Draria, Algiers

Section A — 36°43'N 3°00'E — Overview
Feasibility assessment, detailed costing and comparison of technical options before a project is committed to.
Before investing, you need to know what the works really cost and how long they take. We produce a measurement, a costing by trade package and an outline programme, based on prices actually current in the local market.
Where several solutions are possible — concrete or steel, one more storey or a wider footprint — we compare them on cost, programme, operation and maintenance, so the decision rests on figures.
- Indicative lead time
- 1 to 4 weeks depending on the number of options
- Who it is for
- Investors, developers, industrial operators and local authorities
Section A — 36°43'N 3°00'E — Service in detail
Scope of the assignment
A structured service, from initial analysis to the delivery of documents or the completed work.
- 01Feasibility study
- 02Cost and schedule estimates
- 03Technical option comparison
Section B — 36°43'N 3°00'E — Deliverables
What you receive
- Technical and regulatory feasibility study
- Measurement and detailed estimated bill of quantities
- Outline programme of works
- Costed comparison of the options
- Summary note and recommendation
Methods and tools
- Bordereaux de prix locaux
- MS Project
- Analyse de cycle de vie
Need a quote for this service? Send us your programme and we will come back to you within 48 hours.
Request a quoteOur approach
Each assignment is defined around the project's technical, regulatory and operational constraints.